July 5th, 2010 | Author: jerad.foster
We recently were awarded two KC Magazine Design Excellence Awards. We were honored with a bronze award in the Specialty Room Category for the WDB Walnut Slat Bar. Our Custom Office Furniture for SBMAC took home top honors in the Craftsmanship Category. We were featured in KC Magazine’s July issue in a story featuring local craftsman. The July Issue is also the Design Excellence Awards Issue so we have several photographs of our work throughout the magazine ( the issue is available online click here ).
We want to extend thanks to all of our great clients. We would not be able to produce award winning work if it wasn’t for you. Allowing us the freedom to produce our designs and push the envelope on a daily basis is priceless.


January 27th, 2010 | Author: jerad.foster
Here are some photos of the Fold Furniture Line we recently completed for our clients in Wichita. The series consist of a media center, coffee table, and end table. Constructed with solid Walnut and solid Maple. More photos of the shoot will be posted in a few days. We felt it was necessary to test out the bar with the clients.

Studiobuild; Jerad Foster Nate Adolf



July 13th, 2009 | Author: jerad.foster
A trip last week to wrap up the details in Wichita. The project is 95% percent done. The clients decided to go ahead and have me build the upper wall cabinet now, we had postponed this portion of the project due to the budget but now that all the numbers are in I have the go ahead to build and install it. Here are some pics more to follow once the room is furnished. More photos available on my flickr site.






July 6th, 2009 | Author: jerad.foster
Received an email with some pictures from the client showing the project progress. A few pics of the lights installed. There will be a opaque diffuser installed to finish off the lights. Currently the tile is being installed and grouted. I’ll be travelling down to finish up all of the Studio Build projects this week and touch up any areas that need attention.



June 26th, 2009 | Author: jerad.foster
This week I loaded up a trailer and headed to Wichita to do some installation on the bar and the ceiling. After three long days a lot of progress was made. We installed the bar and the the supporting wall, installed all of the support work for the ceiling and framed in all of the light cavities. Most of the work was done in Kansas City and I brought it down and assembeled on site. The pictures are a little lacking not a lot of lights in yet along with a lot of dust in the air doesn’t lead to good photos.