Here are some photos of the Fold Furniture Line we recently completed for our clients in Wichita.  The series consist of a media center, coffee table, and end table.   Constructed with solid Walnut and solid Maple.  More photos of the shoot will be posted in a few days.  We felt it was necessary to test out the bar with the clients.

Studiobuild; Jerad Foster Nate Adolf

Studiobuild; Jerad Foster Nate Adolf

F7J0009

F7J0049
F7J0071

WDB Project | Walnut Slat Bar _ Wrapping Up

A trip last week to wrap up the details in Wichita. The project is 95% percent done. The clients decided to go ahead and have me build the upper wall cabinet now, we had postponed this portion of the project due to the budget but now that all the numbers are in I have the go ahead to build and install it. Here are some pics more to follow once the room is furnished. More photos available on my flickr site.

WDB20

WDB11

WDB2

WDB1

wbd26

WBD27

WDB Project | Walnut Slat Bar _ Lights are In

Received an email with some pictures from the client showing the project progress. A few pics of the lights installed. There will be a opaque diffuser installed to finish off the lights. Currently the tile is being installed and grouted. I’ll be travelling down to finish up all of the Studio Build projects this week and touch up any areas that need attention.

WDBConstruct12

WDBConstruct11

WDBConstruct13

WDB Project | Walnut Slat Bar

This week I loaded up a trailer and headed to Wichita to do some installation on the bar and the ceiling. After three long days a lot of progress was made. We installed the bar and the the supporting wall, installed all of the support work for the ceiling and framed in all of the light cavities. Most of the work was done in Kansas City and I brought it down and assembeled on site. The pictures are a little lacking not a lot of lights in yet along with a lot of dust in the air doesn’t lead to good photos.

WDBConst1

WDBConstruct4

WDBconstruct2

WDBConstruct3

WDB Project | Walnut Slat Bar _ Progress

Progress is flying along. I should be installing the rest of the Studiobuild pieces in another week. Justin sent us some pics of the cabinets installed.

WDBConstruct8

WDBConstruct10